Family bathroom, full strip-out
1980s bathroom stripped to the frame: new layout, walk-in shower, wall-hung vanity and certified waterproofing.
- Completed
- February 2026
- Duration
- 4 weeks
- Size
- 2.4 × 2.8 m
- Waterproofing
- Certified
- Handover
- On date
24/7 emergency make-safe — burst pipes, storm damage, roof leaks
Call 0491 570 156Sample projects for a fictional business. Filter by the kind of work you’re planning.
1980s bathroom stripped to the frame: new layout, walk-in shower, wall-hung vanity and certified waterproofing.
Floor-to-ceiling shelving with a sliding ladder, hidden desk and integrated LED strip, finished in the workshop.
Rear extension with a raked timber ceiling, stacker doors and a built-in outdoor kitchen, joined to the existing roofline.
Rotten verandah boards, bearers and two posts replaced in matching hardwood; balustrade repaired and repainted.
Wall removed with an engineered beam to open the kitchen to the living area; new island, butler's pantry and flooring.
Fallen branch through a carport roof: made safe the same night, then the roof sheeting, gutter and fascia were replaced.
Demo: photos are placeholders. A live site shows the business’s own, unedited job photos.
Three quick details and a photo or two. We’ll come back with a price range or a time to visit. We call back within 2 business hours.